design?no. of occupied slices from the map report or the actual ratio from synthesis report
2018-10-22 11:17
relationship between the “number of occupied slice” in the PAR report and the ratio of fully used LUT-FF
2018-11-01 16:11
the section as requested : '.bss' at 0xd80 - 0x2fc2b58. Address is already occupied by section:const_data.
2019-03-28 14:03
a design with 80% of occupied slices, but only 26% of registers used, Ram and DSP are also used at 20%
2019-03-05 13:13
of design in terms of occupied Slices by using post place and route reports generated by ISE tool.Now I need
2019-04-29 13:40
that because as I'm doing now, onthe mapping step, this register increases the total number of occupied
2019-01-17 10:25
对人员分布密度OD( Occupied Density)的考虑。根据采样点数据,通过数据拟合得到送风速度与ADPIOD、DROD之间的曲线关系,求解得最优送风
2018-03-30 16:21
认证)测试内容和要求有哪些1 频率误差测试(frequency error measurement)2 占用带宽/载频带宽测试(occupied bandwidth
2020-09-02 11:08
on ISE 13.2.Register utilization is 50%, LUT utilization is 77%, occupied slices is 80%, so it's a big design, but not outrageously big.
2018-10-10 11:02
:phoenix.tegtlob.cetcom.timco.siemic.1.送样4.审核2.检测5.发证3.提交资料测试项目:1. 频率误差测试(Frequency Error Measurement)2. 耦合带宽/载频带宽测试(Occupied
2018-11-19 19:08